Your HVAC Solution Specialist
+1 (626) 890 3588 | info@dulafa.com| EN | VN
Section NameShcematic DrawingRemark
Air Mix SectionAn inspection door is added when the mixing section is after the primary filter section.
Primary Filter SectionAn inspection section is necessary before this section.
Bag Filter SectionAn inspection section is necessary before this section.
Cooling Coild Section
The water damper must be removed when a wet-film humidifier comes after this section.
Heating Coil SectionThe enhanced thickness of copper tubes is required with a heating water source above 70 °C or 90 °C.
Steam Heating SectionThe steam heater should be controlled simultaneously together with the blower.
Electric Heating SectionThe electric heater should be controlled simultaneously together with the blower.
Steam Humidifying SectionA water drainage tray would be necessary in this section if we adopt a steam humidifier.
Rotary Wheel Energy Recovery SectionAdditional space for inspection is required.
Plate-Fin Heat Recovery SectionAdditional space for inspection is required.
UV Sterilization SectionAdditional space for inspection is required.
Section NameShcematic DrawingRemark
Wet-Filming Humidifying SectionIt can be installed after the cooling coil section or wet-film section without additional space.
High Pressure Spray Humidifying SectionWater drainage tray is a must in this section.
Blower SectionAn inspection section is necessary before this section.
Second Return or Exhaust Air Section
Sound Attenuator Section
Air Supply Section
Middle Section
Air Flow Equalizer SectionNormally this section comes after Blower.
Rotary Dehumidifyer SectionAdditional space for inspection is required.
HEPA Filter SectionAdditional space for inspection is required.
Carbon Filter SectionAdditional space for inspection is required.